Construction of a two-span cast-in-place bridge 85 feet in length supported on cast-in-place concrete abutments and bent. Construction of concrete approach slabs, widening of roadway, asphalt paving, installation of metal beam guard railing, pavement striping and installation of fencing along Reeds Creek Rd @ Pine Creek Bridge.
Completion date: January 20, 2017