Future Projects

  • 5 intersections in Tehama County: South Avenue and Rowles Road, South Avenue and Marguerite Avenue, South Avenue and Woodson Avenue, Finnell Avenue and 99W, and Capay Road and 99W. Install splitter-islands on minor road approaches, remove current pavement markings and upgrade intersection pavement markings including a slurry seal, and install flashing beacons as advanced warning on major road approaches. Estimated completion date: 2022 View Vicinity Map as PDF

  • In Tehama from Gyle Road intersection of 99W (formerly old SR 99) and extends north to Red Bluff ending at I-5 overcrossing. Resurfacing and reconfigure pavement delineation/reflective markers, and improvements and signalization at I-5 interchange. Estimated completion date: 2022

  • 99W Gap Closure

    A total of 7.2 miles of improvements within the R/W. Pavement rehabilitation includes Cold-in-Place Recycling and a Hot Mix overlay to existing grade, shoulder widening for ATP (8-foot shoulders), and intersection improvements. The project also updates pavement delineation and reflective markers. Estimated completion date: 2023

  • Storm damage occurred at the Squaw Hollow Creek Bridge in February 2019 during the Governor-declared emergency. Tehama County bridge crew performed emergency repairs only on the eroded portion of the roadway at the bridge. The rest of the damage to the creek and bridge will be repaired and maintained in the coming year to prevent erosion and flooding. Estimated completion date: 2021

  • Construction of Evergreen Road Bridge Replacement over the South Fork Cottonwood Creek. The project consists of replacing the deficient structure, adding turn lanes on Bowman Road to access Evergreen Road, and replacing an Anderson Cottonwood Irrigation District (ACID) crossing. Estimated completion date: 2022

  • Two intersections on Gallagher Avenue: the intersection of Gallagher Avenue and Houghton Avenue, and the intersection of Gallagher Avenue and Edith Avenue. These improvements would make the intersections safer. Install flashing beacons as advanced warning, convert to all way stop control (from 2-way or yield control), and install transverse rumble strips on major road approaches. Estimated completion date: 2022 View Vicinity Map as PDF

  • Two bridge replacements on Kirkwood Road at Jewett Creek and on Columbia Avenue at Jewett Creek in Corning, CA. These projects will be combined under one construction contract. Estimated completion date: Fall of 2021

  • Lake California Drive

    A 3.5 mile segment of Lake California Drive in Cottonwood, CA from 0.25 mile south of Main Street to Sawtooth Drive. Improve segment with curve treatments, edge of pavement treatment, and clearing. Improve shoulder slopes, clear trees as necessary. Install edgeline rumble strips/stripes. Install chevron signs on horizontal curves. Remove or relocate fixed objects outside of Clear Recovery Zone. Estimated completion date: 2022 View Vicinity Map as PDF  

  • Construction of a new bridge in replacement of a low water crossing on McCoy Road at North Fork Dibble Creek. Project includes re-alignment of approximately 2,500’ of McCoy Road and constructs an intersection with Matlock Loop for approximately 600’. Estimated completion date: 2025

  • A new roadway – approximately 1000 feet in length – along the south side of the existing alignment between Moon Shadow Ranch Road and Johnson Road shall be constructed to make it safer for travelers and prevent further erosion near Liza Creek. Estimated completion date: 2023