May 11, 2022
May 11, 2022
The Jelly’s Ferry Bridge replacement project is complete. The old bridge and the temporary construction trestle that you see in one of the photos below have been removed, relieving the waterway of obstruction and narrowing of the passage.
Watercraft now travels normally through the channels.
Designed by: T.Y.Lin International Group
Construction Contractor: MCM Construction, Inc.
Construction Management: Quincy Engineering, Inc.
Completion date: Fall of 2022