May 11, 2022

Jelly’s Ferry Road Over The Sacramento River Bridge Replacement Project

Project Description

The Jelly’s Ferry Bridge replacement project is complete. The old bridge and the temporary construction trestle that you see in one of the photos below have been removed, relieving the waterway of obstruction and narrowing of the passage.

Watercraft now travels normally through the channels.

Project Details

Designed by: T.Y.Lin International Group

Construction Contractor: MCM Construction, Inc.

Construction Management: Quincy Engineering, Inc.

Completion date: Fall of 2022

Project Gallery

More Projects